Ashford Health Centre

By Tetraclad Ltd with Trespa product Sika fixed to frame.

Another pleasing project as we delivered over a fairly protracted main contractor programme with different elevations of work being required ‘out of sync’.

However, with constant communication with Tetraclad we ensured that they were able to keep to programme and we finished up supplying the windows and copings and flashings that give this building a really striking design.